Jendy Verkada National Deployment
News & Events

How Jendy Deploys for Multi-Location National Enterprise Customers

Nationwide Installation Experience in Practice

Jendy reports installation and deployment experience at more than 4,500 locations and operates in all 50 U.S. states. These company-wide figures describe portfolio scale; they are not the size of a single enterprise contract.

Examples behind the portfolio

  • Illinois gaming: Jendy reports deploying Verkada cameras across more than 3,000 gaming locations in 2019
  • Education: more than 80 school districts reported as active clients
  • Tonkawa Tribe & Casino: a completed camera and access control replacement project across the casino and related properties, including Verkada camera installation on the gaming floor

These examples show experience with distributed locations, district clients and a casino replacement project. The school district and Illinois figures describe parts of Jendy’s experience; they should not be added to the location total as separate, non-overlapping deployments.

Applying that experience to a new rollout

Start with a site inventory and a common installation standard. Confirm the scope, readiness and responsible contacts at each location before assigning work. Use the same progress and closeout format across the program, while recording local exceptions. The following sections explain that deployment workflow.

See Jendy’s company background and Verkada’s camera platform for additional context.

Enterprise customers need one deployment plan that can be repeated across locations. Jendy coordinates the site scope, hardware readiness, national scheduling and field documentation so each facility can follow the same core standard while accounting for local conditions.

When setting portfolio standards, account for any approved air quality sensor and Workplace reception and delivery installations alongside cameras and doors. Assign their network readiness, configuration and handoff responsibilities before repeating the design across sites.

Build the deployment standard

An enterprise installation program starts with a documented scope: approved equipment, device names, installation details and the work assigned to each team. Record exceptions by location so a common standard does not hide differences in doors, pathways or operating conditions.

Sequence sites by readiness

Coordinate hardware delivery, facility access, IT prerequisites and the available work window before setting deployment dates. Grouping ready locations and reviewing exceptions early gives the project team a practical basis for scheduling crews.

Give each location a clear finish

Use consistent field reporting and closeout documentation across the program. Review installed components, operating tests, site-specific exceptions and unresolved work with the responsible contact before treating a location as complete.

Related Installation Resources

Continue planning with security system design and planning, live nationwide installation map and client installation readiness form. For a quote, submit your installation scope with the site locations, device quantities and planned schedule.

Download the Planning Guide

Save this companion guide for your project team: Download the national deployment planning whitepaper (PDF). Downloads are free and require no form or email address. Browse our security installation resource library for more guides.

For facility-specific planning, explore our security for large facilities guidance.

Also available: Nationwide Security Deployment whitepaper (PDF).